  • South Bound, starting on October 2, 12:15 pm. Emergency Work will begin at Route 15 and continue to Weighting Station closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on October 2, 12:30 pm. Emergency Work will begin at Route 15 and continue to Weighting Station closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on December 17, 4:15 pm. Guardrail Repair will begin at Weighting Station and continue to Weighting Station closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 5:30 am. Emergency Work will begin at Ranchero Rd and continue to Joshua St closing Lane (2, 3, 4). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Joshua St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on February 4, 10:01 am. Emergency Work will begin at Joshua St and continue to Ranchero Rd closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on February 20, 2:01 am. Emergency Work will begin at Joshua St and continue to Oak Hill Rd closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on February 20, 2:45 am. Emergency Work will begin at Joshua St and continue to Oak Hill Rd closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:45 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:45 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:45 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on July 1, 11:30 am. Emergency Work will begin at Duncan Canyon Rd and continue to Duncan Canyon Rd closing Lane (2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on August 15, 6:01 am. Accident Investigation will begin at Oak Hill Rd and continue to Route 395 closing Lane (3, 4). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on September 23, 2:30 pm. Electrical Work will begin at Weighting Station and continue to Weighting Station closing Lane (Auxiliary). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on November 13, 2:01 am. Emergency Work will begin at Main St and continue to BEAR VALLEY closing Lane (1, 2, 3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on November 14, 2:01 am. Emergency Work will begin at Main St and continue to BEAR VALLEY closing Lane (1, 2, 3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on January 26, 12:30 am. Special Event will begin at Joshua St and continue to Main St closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on January 26, 12:30 am. Special Event will begin at Joshua St and continue to Route 15 closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on April 3, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 4, 4:59 am.
  • South Bound, starting on April 3, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Joshua St closing Full (All). Closures expected to last to April 4, 4:59 am.
  • South Bound, starting on April 3, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 4, 4:59 am.
  • South Bound, starting on April 3, 7:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 4, 4:59 am.
  • South Bound, starting on April 3, 7:01 pm. K-rail Removal will begin at Oak Hill Rd and continue to Route 15 closing Full (All). Closures expected to last to April 4, 4:59 am.
  • South Bound, starting on April 3, 7:01 pm. K-rail Removal will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 4, 4:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 15 closing Full (All). Closures expected to last to April 4, 6:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 4, 6:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 4, 6:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 4, 6:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Route 15 closing Full (All). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 4, 4:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Joshua St and continue to Route 15 closing Full (All). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 4, 8:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 4, 8:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 3, RShoulder). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 4, 5:59 am.
  • North Bound, starting on April 3, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 2, 3, RShoulder). Closures expected to last to April 4, 5:59 am.
Friday April 4
  • South Bound, starting on April 4, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 7:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 7:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 7:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (1, RShoulder, LShoulder). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 7:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 8:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 5, 7:59 am.
  • South Bound, starting on April 4, 8:01 pm. Miscellaneous Work will begin at Route 15 and continue to Joshua St closing Full (All). Closures expected to last to April 5, 7:59 am.
  • South Bound, starting on April 4, 8:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 5, 7:59 am.
  • South Bound, starting on April 4, 8:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 5, 7:59 am.
  • South Bound, starting on April 4, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 4, 10:01 pm. Shoulder Work will begin at Route 138 and continue to Baseline Rd/East Ave closing Lane (4). Closures expected to last to April 5, 5:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 15 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Route 15 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Joshua St and continue to Route 15 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 3, RShoulder). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 5, 6:59 am.
  • North Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 2, 3, RShoulder). Closures expected to last to April 5, 6:59 am.
  • South Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 5, 2:59 am.
  • South Bound, starting on April 5, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 5, 2:59 am.
  • South Bound, starting on April 5, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 6, 7:59 am.
  • South Bound, starting on April 5, 7:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 6, 7:59 am.
  • North Bound, starting on April 5, 8:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 6, 8:59 am.
  • North Bound, starting on April 5, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 6, 7:59 am.
  • North Bound, starting on April 5, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 6, 8:59 am.
  • North Bound, starting on April 5, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (1, 2, RShoulder, LShoulder). Closures expected to last to April 6, 7:59 am.
  • South Bound, starting on April 6, 12:01 am. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 6, 4:59 am.
  • North Bound, starting on April 6, 2:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 6, 5:59 am.
Monday April 7
  • South Bound, starting on April 7, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 8, 4:59 am.
  • South Bound, starting on April 7, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Joshua St closing Full (All). Closures expected to last to April 8, 4:59 am.
  • South Bound, starting on April 7, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 8, 4:59 am.
  • South Bound, starting on April 7, 7:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 8, 4:59 am.
  • South Bound, starting on April 7, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 8, 3:59 am.
  • South Bound, starting on April 7, 8:01 pm. Shoulder Work will begin at Route 138 and continue to Baseline Rd/East Ave closing Lane (4). Closures expected to last to April 8, 3:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 15 closing Full (All). Closures expected to last to April 8, 8:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 8, 8:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 8, 8:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 8, 8:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Route 15 closing Full (All). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Joshua St and continue to Route 15 closing Full (All). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 8, 8:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 8, 8:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 3, RShoulder). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 8, 5:59 am.
  • North Bound, starting on April 7, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 2, 3, RShoulder). Closures expected to last to April 8, 5:59 am.
  • South Bound, starting on April 7, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 8, 2:59 am.
  • South Bound, starting on April 7, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 8, 2:59 am.
  • North Bound, starting on April 8, 1:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 8, 3:59 am.
  • North Bound, starting on April 8, 1:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 8, 3:59 am.
Tuesday April 8
  • South Bound, starting on April 8, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 9, 4:59 am.
  • South Bound, starting on April 8, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Joshua St closing Full (All). Closures expected to last to April 9, 4:59 am.
  • South Bound, starting on April 8, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 9, 4:59 am.
  • South Bound, starting on April 8, 7:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 9, 4:59 am.
  • South Bound, starting on April 8, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (1, LShoulder, 2, RShoulder). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 9, 3:59 am.
  • South Bound, starting on April 8, 8:01 pm. Shoulder Work will begin at Route 138 and continue to Baseline Rd/East Ave closing Lane (4). Closures expected to last to April 9, 3:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 15 closing Full (All). Closures expected to last to April 9, 8:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 9, 8:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 9, 8:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 9, 8:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Route 15 closing Full (All). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Joshua St and continue to Route 15 closing Full (All). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 9, 8:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 9, 8:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 3, RShoulder). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 9, 5:59 am.
  • North Bound, starting on April 8, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 2, 3, RShoulder). Closures expected to last to April 9, 5:59 am.
  • South Bound, starting on April 8, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 9, 2:59 am.
  • South Bound, starting on April 8, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 9, 2:59 am.
  • North Bound, starting on April 9, 1:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 9, 3:59 am.
  • North Bound, starting on April 9, 1:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 9, 3:59 am.
Wednesday April 9
  • South Bound, starting on April 9, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 10, 4:59 am.
  • South Bound, starting on April 9, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Joshua St closing Full (All). Closures expected to last to April 10, 4:59 am.
  • South Bound, starting on April 9, 7:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 10, 4:59 am.
  • South Bound, starting on April 9, 7:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 10, 4:59 am.
  • South Bound, starting on April 9, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 10, 3:59 am.
  • South Bound, starting on April 9, 8:01 pm. Shoulder Work will begin at Route 138 and continue to Baseline Rd/East Ave closing Lane (4). Closures expected to last to April 10, 3:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 15 closing Full (All). Closures expected to last to April 10, 8:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 10, 8:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 10, 8:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 10, 8:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Route 15 closing Full (All). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Joshua St and continue to Route 15 closing Full (All). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 10, 8:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 10, 8:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 3, RShoulder). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 10, 5:59 am.
  • North Bound, starting on April 9, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 2, 3, RShoulder). Closures expected to last to April 10, 5:59 am.
  • South Bound, starting on April 9, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 10, 2:59 am.
  • South Bound, starting on April 9, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 10, 2:59 am.
  • North Bound, starting on April 10, 1:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 10, 3:59 am.
  • North Bound, starting on April 10, 1:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 10, 3:59 am.
Thursday April 10
  • South Bound, starting on April 10, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 6:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 6:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 6:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 7:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 11, 4:59 am.
  • South Bound, starting on April 10, 8:01 pm. Shoulder Work will begin at Route 138 and continue to Baseline Rd/East Ave closing Lane (4). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 11, 3:59 am.
  • South Bound, starting on April 10, 8:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 11, 3:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Route 395 closing Full (All). Closures expected to last to April 11, 4:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 3, RShoulder). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 3, 4, RShoulder). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 4, RShoulder). Closures expected to last to April 11, 8:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, RShoulder). Closures expected to last to April 11, 8:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Joshua St and continue to Route 15 closing Full (All). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Route 395 and continue to Route 15 closing Full (All). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Ranchero Rd closing Full (All). Closures expected to last to April 11, 6:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Ranchero Rd and continue to Route 15 closing Full (All). Closures expected to last to April 11, 6:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Route 15 and continue to Oak Hill Rd closing Full (All). Closures expected to last to April 11, 6:59 am.
  • North Bound, starting on April 10, 9:01 pm. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 15 closing Full (All). Closures expected to last to April 11, 6:59 am.
  • North Bound, starting on April 10, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 1, 2, RShoulder). Closures expected to last to April 11, 5:59 am.
  • North Bound, starting on April 10, 10:01 pm. Miscellaneous Work will begin at Route 395 and continue to Bear Valley Rd closing Lane (LShoulder, 2, 3, RShoulder). Closures expected to last to April 11, 5:59 am.
  • South Bound, starting on April 10, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 11, 2:59 am.
  • South Bound, starting on April 10, 11:01 pm. Miscellaneous Work will begin at Route 395 and continue to Oak Hill Rd closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 11, 2:59 am.
  • North Bound, starting on April 11, 2:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 1, 2, 3, RShoulder). Closures expected to last to April 11, 3:59 am.
  • North Bound, starting on April 11, 2:01 am. Miscellaneous Work will begin at Oak Hill Rd and continue to Route 395 closing Lane (LShoulder, 2, 3, 4, RShoulder). Closures expected to last to April 11, 3:59 am.