  • South Bound, starting on October 2, 12:15 pm. Emergency Work will begin at Route 15 and continue to Weighting Station closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on October 2, 12:30 pm. Emergency Work will begin at Route 15 and continue to Weighting Station closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on December 17, 4:15 pm. Guardrail Repair will begin at Weighting Station and continue to Weighting Station closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 5:30 am. Emergency Work will begin at Ranchero Rd and continue to Joshua St closing Lane (2, 3, 4). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Joshua St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 4, 10:01 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on February 4, 10:01 am. Emergency Work will begin at Joshua St and continue to Ranchero Rd closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:01 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on February 20, 2:01 am. Emergency Work will begin at Joshua St and continue to Oak Hill Rd closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 2:45 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on February 20, 2:45 am. Emergency Work will begin at Joshua St and continue to Oak Hill Rd closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:01 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Ranchero Rd and continue to Route 395 closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:15 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:45 am. Emergency Work will begin at Main St and continue to California Aqueduct closing Lane (3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:45 am. Emergency Work will begin at Route 15 and continue to Main St closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on February 20, 3:45 am. Emergency Work will begin at Main St and continue to Route 15 closing Full (All). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on July 1, 11:30 am. Emergency Work will begin at Duncan Canyon Rd and continue to Duncan Canyon Rd closing Lane (2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on August 15, 6:01 am. Accident Investigation will begin at Oak Hill Rd and continue to Route 395 closing Lane (3, 4). Closures expected to last to December 31, 11:59 pm.
  • South Bound, starting on September 23, 2:30 pm. Electrical Work will begin at Weighting Station and continue to Weighting Station closing Lane (Auxiliary). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on November 13, 2:01 am. Emergency Work will begin at Main St and continue to BEAR VALLEY closing Lane (1, 2, 3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on November 14, 2:01 am. Emergency Work will begin at Main St and continue to BEAR VALLEY closing Lane (1, 2, 3). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on January 26, 12:30 am. Special Event will begin at Joshua St and continue to Main St closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on January 26, 12:30 am. Special Event will begin at Joshua St and continue to Route 15 closing Lane (1). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on June 16, 1:01 pm. Accident Investigation will begin at Oakie Flats Rd and continue to Oakie Flats Rd closing Lane (4, 5). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on September 24, 3:01 pm. Emergency Work will begin at Oakie Flats Rd and continue to Oakie Flats Rd closing Lane (RShoulder). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on December 13, 8:45 pm. Emergency Work will begin at Kenwood Ave and continue to Kenwood Ave closing Lane (1, 2). Closures expected to last to December 31, 11:59 pm.
  • North Bound, starting on June 2, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Route 138 closing Lane (RShoulder). Closures expected to last to June 3, 3:59 am.
  • South Bound, starting on June 2, 8:01 pm. K-rail Installation will begin at Duncan Canyon Rd and continue to South of Duncan Canyon closing Lane (4). Closures expected to last to June 3, 3:59 am.
  • South Bound, starting on June 2, 8:01 pm. K-rail Installation will begin at Ranchero Rd and continue to Oak Hill Rd closing Lane (4). Closures expected to last to June 3, 3:59 am.
  • South Bound, starting on June 2, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Philadelphia St closing Lane (4). Closures expected to last to June 3, 4:59 am.
  • South Bound, starting on June 2, 8:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 3, 3:59 am.
  • South Bound, starting on June 2, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Route 15 closing Lane (2). Closures expected to last to June 3, 3:59 am.
  • South Bound, starting on June 2, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Kenwood Ave closing Lane (2). Closures expected to last to June 3, 3:59 am.
  • South Bound, starting on June 2, 8:01 pm. Guardrail Work will begin at Oak Hill Rd and continue to Glenn Helen Pkwy closing Lane (4). Closures expected to last to June 3, 4:59 am.
  • North Bound, starting on June 2, 9:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Sierra Ave closing Lane (4). Closures expected to last to June 3, 4:59 am.
  • North Bound, starting on June 2, 9:01 pm. Guardrail Work will begin at Oak Hill Rd and continue to Ranchero Rd closing Lane (4). Closures expected to last to June 3, 4:59 am.
  • North Bound, starting on June 2, 9:01 pm. Electrical Work will begin at Route 15 and continue to Route 10 closing Full (All). Closures expected to last to June 3, 4:59 am.
  • South Bound, starting on June 2, 9:01 pm. Guardrail Work will begin at Mathews Ranch Rd and continue to North of Sierra closing Lane (4). Closures expected to last to June 3, 4:59 am.
  • South Bound, starting on June 2, 9:01 pm. Guardrail Work will begin at Joshua St and continue to Devore R/R closing Lane (4). Closures expected to last to June 3, 4:59 am.
  • South Bound, starting on June 2, 9:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 3, 4:59 am.
  • South Bound, starting on June 3, 8:01 am. Electrical Work will begin at Oak Hill Rd and continue to Truck Safety Check Area closing Lane (RShoulder). Closures expected to last to June 3, 3:59 pm.
Wednesday June 3
  • North Bound, starting on June 3, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Route 138 closing Lane (RShoulder). Closures expected to last to June 4, 3:59 am.
  • South Bound, starting on June 3, 8:01 pm. K-rail Installation will begin at Duncan Canyon Rd and continue to South of Duncan Canyon closing Lane (4). Closures expected to last to June 4, 3:59 am.
  • South Bound, starting on June 3, 8:01 pm. K-rail Installation will begin at Ranchero Rd and continue to Oak Hill Rd closing Lane (4). Closures expected to last to June 4, 3:59 am.
  • South Bound, starting on June 3, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Philadelphia St closing Lane (4). Closures expected to last to June 4, 4:59 am.
  • South Bound, starting on June 3, 8:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 4, 3:59 am.
  • South Bound, starting on June 3, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Route 15 closing Lane (2). Closures expected to last to June 4, 3:59 am.
  • South Bound, starting on June 3, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Kenwood Ave closing Lane (2). Closures expected to last to June 4, 3:59 am.
  • South Bound, starting on June 3, 8:01 pm. Guardrail Work will begin at Oak Hill Rd and continue to Glenn Helen Pkwy closing Lane (4). Closures expected to last to June 4, 4:59 am.
  • North Bound, starting on June 3, 9:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Sierra Ave closing Lane (4). Closures expected to last to June 4, 4:59 am.
  • North Bound, starting on June 3, 9:01 pm. Guardrail Work will begin at Oak Hill Rd and continue to Ranchero Rd closing Lane (4). Closures expected to last to June 4, 4:59 am.
  • South Bound, starting on June 3, 9:01 pm. Guardrail Work will begin at Mathews Ranch Rd and continue to North of Sierra closing Lane (4). Closures expected to last to June 4, 4:59 am.
  • South Bound, starting on June 3, 9:01 pm. Guardrail Work will begin at Joshua St and continue to Devore R/R closing Lane (4). Closures expected to last to June 4, 4:59 am.
  • South Bound, starting on June 3, 9:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 4, 4:59 am.
  • South Bound, starting on June 4, 8:01 am. Electrical Work will begin at Oak Hill Rd and continue to Truck Safety Check Area closing Lane (RShoulder). Closures expected to last to June 4, 3:59 pm.
Thursday June 4
  • North Bound, starting on June 4, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Route 138 closing Lane (RShoulder). Closures expected to last to June 5, 3:59 am.
  • South Bound, starting on June 4, 8:01 pm. K-rail Installation will begin at Duncan Canyon Rd and continue to South of Duncan Canyon closing Lane (4). Closures expected to last to June 5, 3:59 am.
  • South Bound, starting on June 4, 8:01 pm. K-rail Installation will begin at Ranchero Rd and continue to Oak Hill Rd closing Lane (4). Closures expected to last to June 5, 3:59 am.
  • South Bound, starting on June 4, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Philadelphia St closing Lane (4). Closures expected to last to June 5, 4:59 am.
  • South Bound, starting on June 4, 8:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 5, 3:59 am.
  • South Bound, starting on June 4, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Route 15 closing Lane (2). Closures expected to last to June 5, 3:59 am.
  • South Bound, starting on June 4, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Kenwood Ave closing Lane (2). Closures expected to last to June 5, 3:59 am.
  • South Bound, starting on June 4, 8:01 pm. Guardrail Work will begin at Oak Hill Rd and continue to Glenn Helen Pkwy closing Lane (4). Closures expected to last to June 5, 4:59 am.
  • North Bound, starting on June 4, 9:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Sierra Ave closing Lane (4). Closures expected to last to June 5, 4:59 am.
  • North Bound, starting on June 4, 9:01 pm. Guardrail Work will begin at Oak Hill Rd and continue to Ranchero Rd closing Lane (4). Closures expected to last to June 5, 4:59 am.
  • South Bound, starting on June 4, 9:01 pm. Guardrail Work will begin at Mathews Ranch Rd and continue to North of Sierra closing Lane (4). Closures expected to last to June 5, 4:59 am.
  • South Bound, starting on June 4, 9:01 pm. Guardrail Work will begin at Joshua St and continue to Devore R/R closing Lane (4). Closures expected to last to June 5, 4:59 am.
  • South Bound, starting on June 4, 9:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 5, 4:59 am.
  • South Bound, starting on June 5, 8:01 am. Electrical Work will begin at Oak Hill Rd and continue to Truck Safety Check Area closing Lane (RShoulder). Closures expected to last to June 5, 3:59 pm.
  • South Bound, starting on June 5, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Philadelphia St closing Lane (4). Closures expected to last to June 6, 4:59 am.
  • South Bound, starting on June 5, 8:01 pm. Guardrail Work will begin at Oak Hill Rd and continue to Glenn Helen Pkwy closing Lane (4). Closures expected to last to June 6, 4:59 am.
  • North Bound, starting on June 5, 9:01 pm. Guardrail Work will begin at Route 15 and continue to Route 138 closing Lane (RShoulder). Closures expected to last to June 6, 4:59 am.
  • South Bound, starting on June 5, 9:01 pm. Guardrail Work will begin at Mathews Ranch Rd and continue to North of Sierra closing Lane (4). Closures expected to last to June 6, 4:59 am.
  • South Bound, starting on June 5, 9:01 pm. Guardrail Work will begin at Joshua St and continue to Devore R/R closing Lane (4). Closures expected to last to June 6, 4:59 am.
  • South Bound, starting on June 5, 10:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 6, 5:59 am.
  • South Bound, starting on June 5, 10:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 6, 5:59 am.
  • South Bound, starting on June 5, 10:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Route 15 closing Lane (2). Closures expected to last to June 6, 5:59 am.
  • South Bound, starting on June 5, 10:01 pm. Guardrail Work will begin at Route 15 and continue to Kenwood Ave closing Lane (2). Closures expected to last to June 6, 5:59 am.
  • South Bound, starting on June 5, 10:01 pm. Striping Operation will begin at Route 15 and continue to Route 10 closing Full (All). Closures expected to last to June 8, 5:01 am.
  • North Bound, starting on June 6, 6:01 am. Special Event will begin at Route 15 and continue to Sierra Ave closing Full (All). Closures expected to last to June 6, 11:01 am.
  • North Bound, starting on June 6, 6:01 am. Special Event will begin at Route 15 and continue to Sierra Ave closing Full (All). Closures expected to last to June 6, 1:01 pm.
  • South Bound, starting on June 6, 6:01 am. Special Event will begin at Route 15 and continue to Sierra Ave closing Full (All). Closures expected to last to June 6, 11:01 am.
  • South Bound, starting on June 6, 6:01 am. Special Event will begin at Route 15 and continue to Sierra Ave closing Full (All). Closures expected to last to June 6, 1:01 pm.
Sunday June 7
  • North Bound, starting on June 7, 5:01 am. Utility Work will begin at Joshua St and continue to California Aqueduct closing Traffic Break (All). Closures expected to last to June 7, 10:01 am.
  • South Bound, starting on June 7, 5:01 am. Utility Work will begin at California Aqueduct and continue to Joshua St closing Traffic Break (All). Closures expected to last to June 7, 10:01 am.
Monday June 8
  • North Bound, starting on June 8, 8:01 pm. Guardrail Work will begin at W Hesperia R/R and continue to BEAR VALLEY closing Lane (4). Closures expected to last to June 9, 4:59 am.
  • South Bound, starting on June 8, 8:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to South of Duncan Canyon closing Lane (4). Closures expected to last to June 9, 3:59 am.
  • South Bound, starting on June 8, 8:01 pm. Guardrail Work will begin at Ranchero Rd and continue to Oak Hill Rd closing Lane (4). Closures expected to last to June 9, 3:59 am.
  • South Bound, starting on June 8, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Philadelphia St closing Lane (4). Closures expected to last to June 9, 4:59 am.
  • South Bound, starting on June 8, 8:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 9, 3:59 am.
  • South Bound, starting on June 8, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Route 15 closing Lane (2). Closures expected to last to June 9, 3:59 am.
  • South Bound, starting on June 8, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Kenwood Ave closing Lane (2). Closures expected to last to June 9, 3:59 am.
  • North Bound, starting on June 8, 9:01 pm. K-rail Installation will begin at Duncan Canyon Rd and continue to Sierra Ave closing Lane (4). Closures expected to last to June 9, 4:59 am.
  • North Bound, starting on June 8, 9:01 pm. Shoulder Work will begin at Oak Hill Rd and continue to Ranchero Rd closing Lane (4). Closures expected to last to June 9, 4:59 am.
  • South Bound, starting on June 8, 9:01 pm. Guardrail Work will begin at Mathews Ranch Rd and continue to North of Sierra closing Lane (4). Closures expected to last to June 9, 4:59 am.
  • South Bound, starting on June 8, 9:01 pm. Guardrail Work will begin at Alray Oh and continue to Devore R/R closing Lane (4). Closures expected to last to June 9, 4:59 am.
  • South Bound, starting on June 8, 9:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 9, 4:59 am.
  • South Bound, starting on June 8, 9:01 pm. Guardrail Work will begin at Route 15 and continue to Main St closing Lane (2). Closures expected to last to June 9, 3:59 am.
  • South Bound, starting on June 8, 9:01 pm. Guardrail Work will begin at Main St and continue to Route 15 closing Lane (2). Closures expected to last to June 9, 3:59 am.
  • North Bound, starting on June 8, 10:01 pm. Slab Replacement will begin at North of Sierra and continue to Devore R/R closing Lane (2, 3, 4). Closures expected to last to June 9, 5:01 am.
  • North Bound, starting on June 8, 10:01 pm. Slab Replacement will begin at Route 15 and continue to Glenn Helen Pkwy closing Full (All). Closures expected to last to June 9, 5:01 am.
  • North Bound, starting on June 8, 10:01 pm. Slab Replacement will begin at Glenn Helen Pkwy and continue to Route 15 closing Full (All). Closures expected to last to June 9, 5:01 am.
  • North Bound, starting on June 9, 8:01 pm. Guardrail Work will begin at W Hesperia R/R and continue to BEAR VALLEY closing Lane (4). Closures expected to last to June 10, 4:59 am.
  • South Bound, starting on June 9, 8:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to South of Duncan Canyon closing Lane (4). Closures expected to last to June 10, 3:59 am.
  • South Bound, starting on June 9, 8:01 pm. Guardrail Work will begin at Ranchero Rd and continue to Oak Hill Rd closing Lane (4). Closures expected to last to June 10, 3:59 am.
  • South Bound, starting on June 9, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Philadelphia St closing Lane (4). Closures expected to last to June 10, 4:59 am.
  • South Bound, starting on June 9, 8:01 pm. Guardrail Work will begin at Duncan Canyon Rd and continue to Route 15 closing Lane (2). Closures expected to last to June 10, 3:59 am.
  • South Bound, starting on June 9, 8:01 pm. Guardrail Work will begin at Kenwood Ave and continue to Route 15 closing Lane (2). Closures expected to last to June 10, 3:59 am.
  • South Bound, starting on June 9, 8:01 pm. Guardrail Work will begin at Route 15 and continue to Kenwood Ave closing Lane (2). Closures expected to last to June 10, 3:59 am.